This system is a tool that allows a global vision of the production status of a workshop:
It is made up of the following parts:
- Current organization of a workshop (Current Status): References, Bom References, Processes, Jobs and production times.
- Historical of States of the workshop, there is evidence of the evolution that has been applied to the structure of the workshop.
- Times: Analysis of the use of production times.
- Industrial Planning: Planning of actions that interfere in the structure of the Current State.
In the client where this methodology was implemented, communication with its SAP platform was required.