Power Team trials.
This Automatic Equipment, tested the equipment level magnetothermic Continuity Crossing phase, mainly electrical insulation. Continuity tests performed with current of one hundred amps and insulation tests with voltages higher than 4KV. Using Visual Basic application and touch screen control and machine dialogue is achieved.